Modeling Correlations in Rail Line Construction

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 9

Abstract

The total construction cost and time of projects are often overrun. It is known that when positive correlations between costs are disregarded, the range of possible total construction costs is underestimated. A model is needed to estimate the effect of correlations on the probability distributions of total cost and total time. Four cost–cost and one cost–time correlations in the construction of rail lines were identified, two of which were investigated in detail using a model applicable to the construction of any networked system. This paper presents the theoretical background of the model, the correlations occurring in rail line construction, and the analysis of the impact of such correlations in two case studies including several scenarios and one sensitivity analysis. The results clearly show that the standard deviation of the total cost increases with the magnitude of the correlation and, most importantly, it dramatically increases with the number of costs that are correlated; it also depends on the type of correlation matrix. Correlation between costs must be modeled to capture the wide range of the possible total cost; otherwise, the total construction cost of projects will continue being significantly underestimated.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers would like to acknowledge that the data for the viaduct and the tunnel case studies were made available by Rede ferroviária de Alta Velocidade(RAVE) and Gabinete de Estructuras e Geotecnia(GEG). The first author is also thankful for the support by the MIT Portugal Program and the Berger Fellowship Foundation.

References

Back, W. E., Boles, W. W., and Fry, G. T. (2000). “Defining triangular probability distributions from historical cost data.” J. Constr. Eng. Manage., 126(1), 29–37.
Bertsekas, D. P., and Tsitsiklis, J. N. (2002). Introduction to probability, Athena Scientific, Belmont, MA.
Cario, M. C., and Nelson, B. L. (1997). “Modeling and generating random vectors with arbitrary marginal distributions and correlation matrix.” Technical report, Northwestern Univ., Evanston, IL.
Chau, K. W. (1995). “The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong.” Constr. Manage. Econ., 13(1), 15–21.
Clemen, R. T., and Reilly, T. (1999). “Correlations and copulas for decision and risk analysis.” Manage. Sci., 45(2), 208–224.
Embrechts, P., Lindskog, F., and McNeil, A. (2003). “Modelling dependence with copulas and applications to risk management.” Handbook of heavy tailed distributions in finance,Svetlozar, T. R., ed., North-Holland, Amsterdam, The Netherlands 329–384.
Embrechts, P., McNeil, A. J., and Straumann, D. (2002). “Correlation and dependence in risk management: Properties and pitfalls.” Risk management: Value at risk and beyond, Dempster, M. A. H., ed., Cambridge University Press, Cambridge, New York, 176–223.
Genest, C., Quessy, J.-F., and Remillard, B. (2006). “Goodness-of-fit procedures for copula models based on the probability integral transformation.” Scand. J. S., 33(2), 337–366.
Ghosh, S., and Henderson, S. G. (2003). “Behavior of the NORTA method for correlated random vector generation as the dimension increases.” ACM Trans. Model. Comput. Simul., 13(3), 276–294.
Haas, C., and Einstein, H. H. (2002). “Updating the decision aids for tunneling.” J. Constr. Eng. Manage., 128(1), 40–48.
Iman, R. L., and Conover, W. J. (1982). “A distribution-free approach to inducing rank correlation among input variables.” Commun. Stat. Simul. Comput., 11(3), 311–334.
Kurowicka, D., and Cooke, R. (2006). Uncertainty analysis with high dimensional dependence modelling, Wiley, Chichester, UK.
Li, S. T., and Hammond, J. L. (1975). “Generation of pseudorandom numbers with specified univariate distributions and correlation coefficients.” IEEE Trans. Syst. Man Cybern., SMC-5(5), 557–561.
Lurie, P. M., and Goldberg, M. S. (1998). “An approximate method for sampling correlated random variables from partially-specified distributions.” Manage. Sci., 44(2), 203–218.
Moret, Y. (2011). “Modeling cost and time uncertainty in rail line construction.” Ph.D. thesis, Massachusetts Institute of Technology, Cambridge, MA.
Moret, Y., and Einstein, H. H. (2012). “Experience in expert estimation of probabilities and correlations for rail line construction.” J. Constr. Eng. Manage., 138(9).
Newton, S. (1992). “Methods of analyzing risk exposure in the cost estimates of high quality offices.” Constr. Manage. Econ., 10(5), 431–449.
Pouliquen, L. Y. (1970). “Risk analysis in project appraisal.” World Bank staff occasional papers, Johns Hopkins Univ. Press, Baltimore.
Rede ferrovíária de Alta Velocidade (RAVE). (2006a). “Ligacao ferroviaria de alta velocidade entre porto e vigo, lote1a, troco aeroporto francisco sa carneiro—braga/barcelos, estudo previo, volume 08—obras de arte: Pontes e viaductos.” Technical report, Lisbon, Portugal.
Rede ferrovíária de Alta Velocidade (RAVE). (2006b). “Ligacao ferroviaria de alta velocidade entre porto e vigo, lote1a, troco aeroporto francisco sa carneiro—braga/barcelos, estudo previo, volume 09—obras de arte: Tuneis.” Technical report, Lisbon, Portugal.
Robert, C. P., and Casella, G. (2004). Monte Carlo statistical methods, 2nd Ed., Springer, New York.
Schmeiser, B. W., and Lal, R. (1982). “Bivariate gamma random vectors.” Oper. Res., 30(2), 355–374.
Schöelzel, C., and Friederichs, P. (2008). “Multivariate non-normally distributed random variables in climate research—Introduction to the copula approach.” Nonlinear Processes Geophys., 15(5), 761–772.
Touran, A. (1993). “Probabilistic cost estimating with subjective correlations.” J. Constr. Eng. Manage., 119(1), 58–71.
Touran, A., and Wiser, E. P. (1992). “Monte Carlo technique with correlated random variables.” J. Constr. Eng. Manage., 118(2), 258–272.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 9September 2012
Pages: 1075 - 1084

History

Received: Dec 19, 2009
Accepted: Nov 2, 2011
Published online: Nov 4, 2011
Published in print: Sep 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Yvonne Moret [email protected]
Former Research Assistant, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, Cambridge, MA 02139 (corresponding author). E-mail: [email protected]
Herbert H. Einstein
F.ASCE
Professor of Civil and Environmental Engineering, Dept. of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Figures

Tables

Media

Share

Share

Copy the content Link

Share with email

Email a colleague

Share