Determining the Probability of Project Cost Overruns
Publication: Journal of Construction Engineering and Management
Volume 139, Issue 3
Abstract
The statistical characteristics of cost overruns experienced from contract award in 276 Australian construction and engineering projects were analyzed. The skewness and kurtosis values of the cost overruns are computed to determine if the empirical distribution of the data follows a normal distribution. The Kolmogorov-Smirnov, Anderson-Darling, and chi-squared nonparametric tests are used to determine the goodness of fit of the selected probability distributions. A three-parameter Frechet probability function is found to describe the behavior of cost overruns and provide the best overall distribution fit. The Frechet distribution is then used to calculate the probability of a cost overrun being experienced. The statistical characteristics of contract size and cost overruns were also analyzed. The Cauchy (), Wakeby (A$1 to 10 million, ) and four-parameter Burr (A$11 to 50 million) tests were found to provide the best distribution fits and used to calculate cost overrun probabilities by contract size. Ascertaining the best fit probability distribution from an empirical distribution at contract award can produce realistic probabilities of cost overruns, which should then be incorporated into a construction cost contingency.
Get full access to this article
View all available purchase options and get full access to this article.
References
Alreck, P. L., and Settle, R. B. (1985). The survey research handbook, Richard D. Irwin, Homewood, IL.
Arditi, D., Tarim, G., and Gurdamar, S. (1985). “Cost overruns in public projects.” Int. J. Project Manage., 3(4), 218–224.
Ashan, K., and Gunawan, I. (2010). “Analysis of cost and schedule performance of international development projects.” Int. J. Project Manag., 28(1), 68–78.
Attala, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.” J. Constr. Eng. Manage., 129(4), 405–411.
Auditor General Sweden (1994). Riksrevisionsverket. Infrastrukturinvesteringar: En kostnadsjämörelse mellan plan og utyfall i 15 storre prosjekt innöm Vägverket og Banverket, RVV, 23, Stockholm, Sweden.
Bhargava, A., Anastasopoulos, P., Labi, S., Sinha, K. C., and Mannering, F. L. (2010). “Three-stage least squares analysis of time and cost overruns in construction contracts.” J. Constr. Eng. Manage., 136(11), 1207–1218.
Birnie, J., and Yates, A. (1991). “Cost prediction using decision/risk analysis methodologies.” Constr. Manage. Econ., 9(2), 171–186.
Chang, A. S.-T. (2002). “Reasons for cost and schedule increase for engineering design projects.” J. Manage. Eng., 18(1), 29–36.
Clark, F. D., and Lorenzoni, A. B. (1985). Applied cost engineering, Marcel Dekker, New York.
Coles, S. (2001). An introduction to statistical modeling of extreme values, Springer, Berlin.
Flyvbjerg, B. (2007a). “Policy and planning for large scale-infrastructure projects: Problems, causes, and cures.” Environ. Plann. B Plann. Des., 34(1), 578–597.
Flyvbjerg, B. (2007b). “Cost overruns and demand shortfalls in urban rail and other infrastructure.” Transp. Plann. Technol., 30(1), 9–30.
Flyvbjerg, B. (2008). “Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice.” Eur. Plann. Stud., 16(1), 3–21.
Flyvbjerg, B., and Cowi. (2004). Procedures for dealing with optimism bias in transport planning: Guidance document, UK Department of Transport, London.
Flyvbjerg, B., Holm, M., and Buhl, S. (2002). “Underestimating costs in public works projects: Errors or lie?” J. Am. Plann. Assoc., 68(3), 279–295.
Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delays and cost overruns in construction groundwater projects in developing countries: Ghana case study.” Int. J. Proj. Manage., 21(5), 321–326.
Gkritza, K., and Labi, S. (2008). “Estimating cost discrepancies in highway contracts: Multistep economic approach.” J. Constr. Eng. Manage., 134(12), 953–962.
Gunhan, S., and Arditi, D. (2007). “Budgeting owner’s construction contingency.” J. Constr. Eng. Manage., 133(7), 492–497.
Hester, W. T., Kuprenas, J. A., and Chang, T. C. (1991). “Construction changes and change orders: Their magnitude and impact, Source document 66.” Construction Industry Institute, Univ. of Texas, Austin, TX.
Hinze, J., Selstead, G., and Mahoney, J. P. (1992). “Cost overruns on State of Washington construction contracts.”, Transportation Research Board, Washington, DC, 87–93.
Ibbs, C. W., and Allen, W. E. (1995). “Quantitative impacts of project change, Source document 118.” Construction Industry Institute, Univ. of Texas, Austin, TX.
Jahren, C., and Ashe, A. M. (1990). “Predictors of cost-overrun rates.” J. Constr. Eng. Manage., 116(3), 548–552.
Jergeas, G. F., and Runwanpura, J. (2010). “Why cost and schedule overruns on mega oil sands projects?” Pract. Period. Struct. Des. Constr., 15(1), 40–43.
Jones, L. R., and Euske, K. J. (1991). “Strategic misrepresentation in budgeting.” Journal of public administration research and theory : J-PART, 1(4), 437–460.
Kahneman, D., Slovic, P., and Tversky, A. (1982). Judgment under uncertainty: Heuristics and biases, Cambridge Univ. Press, Cambridge.
Knight, K., and Fayak, A. R. (2002). “Use of fuzzy logic for predicting design cost overruns on building projects.” J. Constr. Eng. Manage., 128(6), 503–512.
Lovallo, D., and Kahneman, D. (2003). “Delusions of success: How optimism undermines executives’ decisions.” Harvard Bus. Rev., 56–63.
Love, P. E. D. (2002). “Influence of project type and procurement method on rework costs in building construction projects.” J. Constr. Eng. Manage., 128(1), 18–29.
Love, P. E. D., Cheung, S. O., Irani, Z., and Davis, P. R. (2011). “Causal discovery and inference of project disputes.” IEEE Trans. Eng. Manage., 58(3), 400–411.
Love, P. E. D., Edwards, D. J., and Irani, Z. (2012). “Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns.” IEEE Trans. Eng. Manage., 59(4), 560–571.
Love, P. E. D., Edwards, D. J., Smith, J., and Walker, D. H. T. (2009). “Congruence or divergence? A path model of rework in building and civil engineering projects.” J. Perform. Constr. Facil., 23(6), 480–488.
Love, P. E. D., Edwards, D. J., Watson, H., and Davis, P. R. (2010). “Rework in civil engineering projects: Determination of cost predictors.” J. Constr. Eng. Manage., 136(3), 275–282.
Matsumoto, M., and Nishimura, T. (1998). “Mersenne Twister: A 623-dimensionally equidistributed uniform pseudo-random number generator.” ACM Trans. Modell. Comput. Simul., 8(1), 3–30.
Nijkamp, P., and Ubbels, B. (1999). How reliable are estimates of infrastructure costs? A comparative analysis, Faculty of Economics, Business Administration and Econometrics, Free Univ., Amsterdam, the Netherlands.
Odeck, J. (2004). “Cost overruns in road construction: What are their sizes and determinants?” Transport Policy, 11(1), 43–53.
Odeck, J., and Skjeseth, T. (1995). “Assessing Norwegian toll roads.” Transportation quarterly / Eno Foundation for Transportation, 49(2), 89–98.
Oppenheim, A. N. (1992). Questionnaire design, interviewing and attitude measurement, Pinter, London.
Project Management Institute. (2008). A guide to the project management of knowledge (PMBOK), 4th Ed., Project Management Institute, Newton Square, PA.
Randolph, D. A., Rajandra, K., and Campfield, J. J. (1987). “Using risk management techniques to control construction costs.” J. Constr. Eng. Manage., 3(4), 314–324.
Rowland, M. (1981). “The causes and effects of change orders on the construction process.” Master’s thesis, Georgia Institute of Technology, Atlanta.
Rowlinson, S. (1999). “A definition of procurement systems.” Procurement systems: A guide to best practice in construction, S. Rowlinson and P. McDermott, eds., E & F Spon, London, 27–53.
Semple, C., Harman, F. T., and Jergeas, G. (1994). “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage., 120(4), 785–795.
Skamris, M. K., and Flyvbjerg, B. (1996). “Accuracy of traffic forecasts and cost estimates on large transportation projects.”, Transportation Research Board, Washington, DC, 65–69.
Skamris, M. K., and Flyvbjerg, B. (1997). “Inaccuracy of traffic forecasts and cost estimates on large transportation projects.” Transport Policy, 4(3), 141–146.
Vidalis, S. M., and Najafi, F. T. (2002). “Cost and time overruns in highway construction.” Proc., 4th Transportation Specialty Conf. of the Canadian Society of Civil Engineering, Canadian Society of Civil Engineering, Montreal, QC.
Western Australia Auditor General. (2010a). “Fiona Stanley Hospital project, Report 5.” 〈www.audit.wa.gov.au/reports〉 (Jul. 18, 2011).
Western Australia Auditor General. (2010b). “Planning and Management of Perth Arena, Report 1.” 〈www.audit.wa.gov.au/reports〉 (Jul. 18, 2011).
Zeitoun, A., and Oberlander, G. (1993). Early warning signs of project changes, Source Document 91, Construction Industry Institute, Univ. of Texas, Austin, TX.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Aug 11, 2011
Accepted: Jan 31, 2012
Published online: Apr 28, 2012
Published in print: Mar 1, 2013
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.