Recovery of Cooling Water Circulation Tunnel Collapse: Construction of Permanent Bulkhead by Ground Freezing

Publication: Tunneling and Underground Construction

Abstract

In a power plant, two shield tunnels were constructed for circulating cooling water under the Yangtze River. During the construction of one line, a collapse occurred because of the abundance of methane in the ground. Artificial ground freezing (AGF) was adopted to recover the collapsed tunnel. A working platform was built above the river to facilitate ground freezing. The frozen soil wall (temporary ice bulkhead) formed in freezing was watertight and strong, providing temporary support before the concrete permanent bulkhead was constructed. This paper describes the design of chosen recovery option and the use of ground freezing which provides a safe environment for the permanent bulkhead construction and later works.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Tunneling and Underground Construction
Tunneling and Underground Construction
Pages: 829 - 835

History

Published online: May 22, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Xiangdong Hu [email protected]
Associate Professor, Department of Geotechnical Engineering, Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China. E-mail: [email protected]
Jintai Wang [email protected]
Graduate Student, Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Figures

Tables

Media

Share

Share

Copy the content Link

Share with email

Email a colleague

Share