Calculation Methods for the Jacking Force of a Rectangular Pipe Jacking Tunnel: Overview and Prospects
Publication: Journal of Pipeline Systems Engineering and Practice
Volume 16, Issue 3
Abstract
The jacking force in the construction process of rectangular pipe jacking tunnels is characterized by its intermittent, discontinuous, and unstable nature. This force not only determines the speed of tunneling but also controls the rate at which soil stress is released, leading to deformation of the formation and land subsidence, thereby impacting the surrounding environment. To accurately calculate and predict the jacking force of rectangular pipe jacking tunnels, this study conducts a comprehensive investigation and analysis of relevant literature on the calculation methods employed both domestically and internationally. The calculation methods are categorized into four types: experimental analysis methods, numerical simulation methods, theoretical formula methods, and empirical formula methods. The research content of each of these methods is analyzed and organized, and the existing research is summarized in terms of its problems and shortcomings. Furthermore, suggestions for future research on the calculation method of the jacking force are proposed, aiming to provide a technical reference for the theoretical research and engineering practice of calculating and predicting the jacking force of rectangular pipe jacking tunnels.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
The authors would like to acknowledge the financial support provided by the National Natural Science Foundation of China (Grant No. 51678226), the Natural Science Foundation of Hunan Province (Grant No. 2023JJ30110), the Key Scientific Research Project of Hunan Provincial Department of Education (Grant No. 23A0568).
References
Bao, X. K., and L. J. Liang. 2014. “Numerical modeling research of rectangle pipe-jacking construction.” Appl. Mech. Mater. 578 (Apr): 921–924. https://doi.org/10.4028/www.scientific.net/AMM.578-579.921.
Barla, M., and M. Camusso. 2013. “A method to design microtunnelling installations in randomly cemented Torino alluvial soil.” Tunnelling Underground Space Technol. 33 (Jun): 73–81. https://doi.org/10.1016/j.tust.2012.09.002.
Bing, H., A. J. Jerula, W. Shuhong, and W. Pengyu. 2017. “Research on jacking force prediction method of rectangular pipe jacking based on Platts unloading arch theory.” Archit. Des. Manage. 34 (9): 84–89.
Chapman, D., and Y. Ichioka. 1999. “Prediction of jacking forces for microtunnelling operations.” Tunnelling Underground Space Technol. 14 (Jul): 31–41. https://doi.org/10.1016/S0886-7798(99)00019-X.
Chen, F.-Q., S.-Q. Fang, and L.-B. Lin. 2023a. “Mechanical analyses of underground pipelines subjected to ground subsidence considering soil-arching effect.” J. Pipeline Syst. Eng. Pract. 14 (2): 04022076. https://doi.org/10.1061/JPSEA2.PSENG-1405.
Chen, P., X. Liu, Z. Deng, N. Liang, L. Du, H. Du, Y. Huang, L. Deng, and G. Yang. 2023b. “Study on the pipe friction resistance in long-distance rock pipe jacking engineering.” Underground Space 9 (Aug): 173–185. https://doi.org/10.1016/j.undsp.2022.07.006.
Chen, X. 2022. “Design and application of temporary jacking base structure for large-section rectangular pipe jacking.” Constr. Technol. 51 (22): 126–131.
Cheng, W.-C., J. C. Ni, A. Arulrajah, and H.-W. Huang. 2018. “A simple approach for characterising tunnel bore conditions based upon pipe-jacking data.” Tunnelling Underground Space Technol. 71 (Feb): 494–504. https://doi.org/10.1016/j.tust.2017.10.002.
Chinese Standard. 2008a. Code for construction and acceptance of water supply and drainage pipeline engineering: State administration of quality supervision. GB 50268-52008. Beijing: Chinese Standard.
Chinese Standard. 2008b. Pipe jacking construction regulations. DG/TJ08-2049-2008. Beijing: Chinese Standard.
Chinese Standard. 2008c. Technical specification for pipe jacking of water supply and sewerage engineering. CECS246-2008. Beijing: Chinese Standard.
Chinese Standard. 2012. Pipe jacking construction technology and acceptance specification: China University of Geosciences. Beijing: Chinese Standard.
Chinese Standard. 2020. Rectangular pipe jacking engineering standard for comprehensive pipe corridor. DB32/T2020. Beijing: Chinese Standard.
Chinese Standard. 2021a. Pipe jacking engineering technical specification. DB21/T3360-2021. Beijing: Chinese Standard.
Chinese Standard. 2021b. Rectangular pipe jacking engineering technical specification. DBJ/T15-229-2021. Beijing: Chinese Standard.
Choo, C., and D. Ong. 2020. “Assessment of non-linear rock strength parameters for the estimation of pipe-jacking forces. Part 2. Numerical modeling.” Eng. Geol. 265 (Sep): 105405. https://doi.org/10.1016/j.enggeo.2019.105405.
Cui, H., L. Kou, Z. Xiong, and J. Zhao. 2023. “Detection and analysis of slurry jacket for pipe jacking construction in soft ground.” J. Civ. Struct. Health Monit. 13 (2): 309–317. https://doi.org/10.1007/s13349-022-00639-4.
Cui, Q.-L., Y.-S. Xu, S.-L. Shen, Z.-Y. Yin, and S. Horpibulsuk. 2015. “Field performance of concrete pipes during jacking in cemented sandy silt.” Tunnelling Underground Space Technol. 49 (Aug): 336–344. https://doi.org/10.1016/j.tust.2015.05.005.
Cundall, P. A., and O. D. Strack. 1979. “A discrete numerical model for granular assemblies.” Géotechnique 29 (1): 47–65. https://doi.org/10.1680/geot.1979.29.1.47.
Deng, Z., N. Liang, X. Liu, A. de la Fuente, P. Lin, and H. Peng. 2021. “Analysis and application of friction calculation model for long-distance rock pipe jacking engineering.” Tunnelling Underground Space Technol. 115 (Jun): 104063. https://doi.org/10.1016/j.tust.2021.104063.
Dong, B.-Y., X.-Q. Gao, Z.-C. Ma, F. Hao-Bo, and Z. Zheng-Guo. 2023. “Jacking force and mechanical characteristics of back structure in tunneling construction with manual jacking method.” Sci. Technol. Eng. 23 (21): 9192–9198.
Fan, Q., Y. Li, and J. Ge. 2008. Specification for construction of pipe jacking. DG/TJ08-2049-2008. Beijing: Chinese Standard.
Feng, H., X. Wen, G. Wei, C. Liu, Y. Zhongxuan, and G. Xiaonan. 2003. “In-situ test research on influence of pipe jacking on soil.” Rock Soil Mech. 24 (5): 781–785. https://doi.org/10.16285/j.rsm.2003.05.025.
Feng, X., P. Zhang, X. Chen, Y. Zhang, B. Ma, K. Liu, T. Xu, and C. Zeng. 2023. “Field mechanical properties of large section concrete pipes during jacking in fractured moderately weathered siltstone.” Tunnelling Underground Space Technol. 131 (Apr): 104818. https://doi.org/10.1016/j.tust.2022.104818.
Feng, X., Y. Zhang, X. Yuan, and P. Zhang. 2022. “An experimental study on frictional properties of concrete pipe–soil interface.” J. Pipeline Syst. Eng. Pract. 13 (2): 04022004. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000638.
Gan, S., L. Peng, M. Lei, L. Zhu, and T. Zhihui. 2023. “Study on calculation method of friction resistance of shallow rectangular pipe jacking tunnel with large section considering pipe-soil/mud contact state.” J. Cent. South Univ. 54 (3): 1178–1186.
Gong, C., G. Wei, and R. Xu. 2005. “Permissible counterforce calculation in rectangular opencaisson working well during pipe jacking.” J. Rock Mech. Geotech. Eng. 26 (7): 1127–1131. http://10.16285/j.rsm.2005.07.025.
Gu, C., C. Xia, X. Li, and Y. Guangming. 2007. “Study on calculation of thrust for culvert box pushed within pipe. Roof in soft soil layer.” Chin. J. Underground Space Eng. 1: 128–131.
Hao, Z., H. Zhang, G. Zhang, W. Xiong, and L. Wang. 2022. “The prediction of ground settlement of a box culvert jacked under the action of an ultra-shallow buried pipe curtain.” Arab. J. Sci. Eng. 47 (10): 12423–12438. https://doi.org/10.1007/s13369-021-06417-6.
Haslem, R. 2011. “Pipe-jacking forces: From practice to theory.” In Proc., Int. Conf. on Infrastructure Renovation and Waste Control 8th–10th APRIL 1986: An Int. Conf. and Exhibition to Celebrate the North Western Association Centenary. Seattle: North Western Association.
He, L., C. Liu, and G. Shuai. 2001. “Research on jacking force design and calculation for pipe jacking construction.” In Water supply and drainage, 87–89. Paris: EDP Sciences.
He, S., X. Dou, L. Zhao, C. Xianhui, W. Jinbo, and B. Qingfeng. 2019. “Analysis of thrust force of adjacent construction of shallow-buried rectangular pipe jacking tunnel group.” Tunnel Constr. 39 (3): 383–390.
Hideki, S., S. Takashi, I. Masafumi, K. Shiro, and M. Kikuo. 2000. “A new method for the construction of small diameter tunnels using pipe jacking.” In Proc., ISRM Int. Symp., 173–180. Lisbon, Portugal: International Society for Rock Mechanics.
Hu, D., Y. Hu, S. Yi, X. Liang, Y. Li, and X. Yang. 2023. “Prediction method of surface settlement of rectangular pipe jacking tunnel based on improved PSO-BP neural network.” Sci. Rep. 13 (1): 5512. https://doi.org/10.1038/s41598-023-32189-0.
Huang, Z., Y. Yang, D. Tang, and Z. Weizhong. 2020. “Numerical simulation and monitoring of reaction wall of launching shaft for large rectangular pipe jacking.” Tunnel Constr. 40 (7): 972–980.
Huashen, T., L. Shuzhuo, and M. Haihong. 2004. “Discussion on theoretical formulae of lateral friction resistance for pipe-jacking.” Supplement, J. Rock Mech. Geotech. Eng. 25 (S2): 574–576. http://10.16285/j.rsm.2004.s2.121.
Jao, C., X. Zhao, and F.-J. Niu. 2020. “Pipe-soil contact state and jacking force prediction of rectangular pipe jacking.” J. Northeastern Univ. 41 (10): 1459–1464.
Ji, H., Y. Llu, Q. Zhang, Z. Llu, A. Juntong, and W. Yaozheng. 2023. “Construction technique study on shallow-buried large section rectangular pipe jacking undercrossing Beijing Hangzhou Grand Cana.” Constr. Technol. 52 (7): 39–45.
Ji, X. 2017. “Estimation of jacking force during jacking pipes in Shenyang sandy stratum.” Doctoral dissertation, Northeastern Univ.
Ji, X., W. Zhao, P. Ni, M. Barla, J. Han, P. Jia, Y. Chen, and C. Zhang. 2019. “A method to estimate the jacking force for pipe jacking in sandy soils.” Tunnelling Underground Space Technol. 90 (Apr): 119–130. https://doi.org/10.1016/j.tust.2019.04.002.
Jia, P., C. Jiao, and W. Zhang. 2013. “Numerical estimation on jacking force and resistance relieving effect of large-diameter pipe jacking in Shenyang.” J. Northeastern Univ. 34 (8): 1206–1209.
Jia, Y. 2020. Study on the influence of rectangular pipe jacking tunnel construction on stratum and adjacent underground pipeline. Shijiazhuang, China: Shijiazhuang Tiedao Univ.
Jian, G., and Z. Yitong. 2010. “Face stability analysis of tunnel considering shield advance velocity.” J. Rock Mech. Geotech. Eng. 31 (7): 2232–2237. https://doi.org/10.16285/j.rsm.2010.07.015.
Jiang, Z., B. Zhang, S. Liu, H. Wang, and Y. Liu. 2022. “Influence of large-section rectangular pipe jacking on deformation of existing subway tunnels.” J. Eng. Geol. 30 (5): 1703–1712.
Khazaei, S., H. Shimada, and K. Matsui. 2004. “Analysis and prediction of thrust in using slurry pipe jacking method.” Tunnelling Underground Space Technol. 19 (4–5): 356.
Khazaei, S., W. Wu, H. Shimada, and K. Matsui. 2006. “Effect of lubrication strength on efficiency of slurry pipe jacking.” In Underground construction and ground movement, 170–177. Reston, VA: ASCE.
Kong, C., G. Guan, S. Gu, Z. Zhou, and H. Wang. 2023. “Frictional resistance calculation and jacking force prediction of rectangular pipe jacking.” Sci. Rep. 13 (1): 14992. https://doi.org/10.1038/s41598-023-42189-9.
Lei, H.-Y., X. Liu, F. Shi, and X. Ying-Gang. 2021. “Proportional optimization of polymer-modified bentonite slurry in pipe jacking.” Supplement, Chin. J. Geotech. Eng. 43 (S2): 51–55.
Li, C., Z. Zhong, X. Liu, Y. Tu, and G. He. 2019. “Numerical simulation for an estimation of the jacking force of ultra-long-distance pipe jacking with frictional property testing at the rock mass–pipe interface.” Tunnelling Underground Space Technol. 89 (Sep): 205–221. https://doi.org/10.1016/j.tust.2019.04.004.
Li, F., K. Fang, and H. Li. 2007. “Application of ANSYS 3D FEM in studies of surface deformation caused by pipe jacking.” Wuhan Univ. J. Nat. Sci. 12 (4): 633–637. https://doi.org/10.1007/s11859-006-0307-7.
Li, H., Y. Yang, X. Tu, and T. Wang. 2012. “Analysis of jacking force for rectangular pipe jacking machine.” Prz. Elektrotech. 88 (9): 200–203.
Li, S. 2021. “On construction technology of rectangular shield pipe jacking and under passing municipal facilities.” Shanxi Archit. 47 (23): 130–131. https://doi.org/10.13719/j.cnki.1009-6825.2021.23.046.
Li, T., X. Chen, W. Chen, and X. Yuan. 2021a. “Experimental study on interface frictional property between sand and concrete pipe jacking.” Bull. Geol. Sci. Technol. 40 (6): 178–184. https://doi.org/10.19509/j.cnki.dzkq.2021.0617.
Li, T., W. Zhao, J. Han, S. Li, L. Bo, Z. Lin, and S. Zhangpeng. 2022. “Experimental study on shear mechanical properties of interface between mud screen of jacking pipe and concrete.” J. Basic Sci. Eng. 30 (2): 396–406. https://doi.org/10.16058/j.issn.1005-0930.2022.02.012.
Li, T., W. Zhao, R. Liu, J. Han, and C. Cheng. 2021b. “Experimental study on the pipe-soil interface under the influence of pipe jacking stagnation time.” KSCE J. Civ. Eng. 26 (3): 1428–1438. https://doi.org/10.1007/s12205-021-0642-4.
Li, X.-Y., and G.-B. Liu. 2017. “A complex variable solution for rectangle pipe jacking in elastic half-plane.” Math. Probl. Eng. 2017 (1): 5713063. https://doi.org/10.1155/2017/5713063.
Liang, W. 2015. “The stability of EPB rectangular pipe jacking tunnel face.” Dept. of Architecture and Civil Engineering, Inner Mongolia Univ. of Science and Technology.
Lin, Y., L. Peng, G. Wu, Y. Weichao, S. Chenghua, and L. Mingfeng. 2017. “Discussion of a theoretical formula for the friction resistance of a pipe wall in quasi-rectangular pipe jacking.” Mod. Tunnelling Technol. 54 (4): 180–185. https://doi.org/10.13807/j.cnki.mtt.2017.04.024.
Liu, G., Z. Yang, H. Yao, Z. Zhang, and J. Wang. 2019. “Disturbance effect analysis of pipe jacking construction based on failure approach index.” In Proc., MATEC Web of Conf. Paris: EDP Sciences.
Liu, H., Y. Fu, H. Zheng, and L. He. 2016. “Discussion on calculation of jacking frontal resistance in pipe jacking project.” Water Wastewater Eng. 52 (3): 106–111. https://doi.org/10.13789/j.cnki.wwe1964.2016.0096.
Liu, J., H. Cheng, H. Cai, and X. Wang. 2022. “Design and analysis of grouting pressure in slurry pipe jacking based on the surrounding soil stability mechanical characteristics.” Geofluids 2022 (1): 4697730.
Liu, W., J. Tan, J. Shi, X. Huang, and W. Chen. 2024. “A method for calculating jacking force of parallel pipes considering soil arching effect and pipe-slurry-soil interaction.” Comput. Geotech. 173 (Sep): 106528. https://doi.org/10.1016/j.compgeo.2024.106528.
Liu, W., Y. Wu, H. Zhao, X. Xu, and L. Miao. 2021. “Deformations of subway tunnels induced by the overcrossing jacked box tunnels.” Symmetry 13 (10): 1800. https://doi.org/10.3390/sym13101800.
Liu, Z., and C. Yng. 2016. “Forming law of thixotropic mud holster and test of reducingresistance effect in rectangular pipe jacking tunnel construction.” J. Henan Polytech. Univ. 35 (4): 568–576. https://doi.org/10.16186/j.cnki.1673-9787.2016.04.021.
Lu, X., H.-M. Bal, X.-C. Chen, C. Jin-Jian, and W. Jian-Hua. 2014. “Field test of mechanical properties of large diameter concrete jacking pipe in soft soil.” J. Shanghai Jiaotong Univ. 48 (11): 1503–1509. https://doi.org/10.16183/j.cnki.jsjtu.2014.11.001.
Luo, Z., Y. Zhang, J. Chen, X. Ou, and X. Zhang. 2024. “Stress and deformation response of pipe jacking in upper-soft and lower-hard strata: A case study in Changsha.” Eng. Fail. Anal. 166 (Sep): 108879. https://doi.org/10.1016/j.engfailanal.2024.108879.
Ma, A., H. Tan, L. Yang, and G. Shaoyu. 2023. “The design of the segments of rectangular pipe-jacking tunnels with large sections in a complex condition.” Hazard Control Tunnelling Underground Eng. 5 (1): 81–89. https://doi.org/10.19952/j.cnki.2096-5052.2023.01.09.
Ma, P., H. Shimada, T. Sasaoka, A. Hamanaka, D. N. Moses, T. K. Dintwe, F. Matsumoto, B. Ma, and S. Huang. 2022a. “A new method for predicting the friction resistance in rectangular pipe-jacking.” Tunnelling Underground Space Technol. 123 (Jun): 104338. https://doi.org/10.1016/j.tust.2021.104338.
Ma, P., H. Shimada, T. Sasaoka, D. N. Moses, F. Matsumoto, and X. Chen. 2022b. “Investigation on the engineering effects of the geometrical configuration of the jacking rectangular pipe.” Tunnelling Underground Space Technol. 119 (Aug): 104239. https://doi.org/10.1016/j.tust.2021.104239.
Ma, S., M. Li, J. Jin, and K. Bai. 2021. “The influence of shallow buried double-line parallel rectangular pipe jacking construction on ground settlement deformation.” Alexandria Eng. J. 60 (1): 1911–1916. https://doi.org/10.1016/j.aej.2020.11.038.
Mollon, G., D. Dias, and A. H. Soubra. 2013. “Continuous velocity fields for collapse and blowout of a pressurized tunnel face in purely cohesive soil.” Int. J. Numer. Anal. Methods Geomech. 37 (13): 2061–2083. https://doi.org/10.1002/nag.2121.
Mollon, G., D. Dias, and A.-H. Soubra. 2009. “Probabilistic analysis of circular tunnels in homogeneous soil using response surface methodology.” J. Geotech. Geoenviron. Eng. 135 (9): 1314–1325. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000060.
Namli, M., and E. Guler. 2017. “Effect of bentonite slurry pressure on interface friction of pipe jacking.” J. Pipeline Syst. Eng. Pract. 8 (2): 04016016. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000255.
Niu, Z., Y. Cheng, Y. Zhang, Z. Song, G. Yang, and H. Li. 2020. “A new method for predicting ground settlement induced by pipe jacking construction.” Math. Probl. Eng. 2020 (1): 1681347.
Ong, D., and C. Choo. 2016. “Back analysis and finite element modeling of jacking forces in weathered rocks.” Tunnelling Underground Space Technol. 51 (Feb): 1–10. https://doi.org/10.1016/j.tust.2015.10.014.
Ong, D., and C. Choo. 2018. “Assessment of non-linear rock strength parameters for the estimation of pipe-jacking forces. Part 1. Direct shear testing and back analysis.” Eng. Geol. 244 (Mar): 159–172. https://doi.org/10.1016/j.enggeo.2018.07.013.
Ou, W., D. Zhang, C. Zeng, B. Wu, and Z. Fu. 2023. “Study on pipe-soil contact state and jacking force of rectangular jacking.” Chin. J. Underground Space Eng. 19 (3): 760–766.
Pan, W., B. Lao, and X. Lu. 2022a. “Mechanical behaviors of quasi-rectangular steel pipe jacking structure with large cross-section: A case study of Jing’an temple pipe jacking station on Shanghai metro line 14.” Tunnel Constr. 42 (6): 975–983.
Pan, Y.-Q., L. Zhem, H.-L. Jang, and L. Xiao-Jun. 2022b. “Model tests on large-section and shallow soil rectangular pipe jacking.” Supplement, Chin. J. Geotech. Eng. 44 (S2): 125–129.
Peerun, M., D. Ong, C. Choo, and F. Phangkawira. 2017. “Novel methods in estimating pipe-jacking forces in highly fractured rocks.” No Dig India 13 (1): 16–26.
Pei, C., B. Shi, Y. Peng, J. Niu, and Y. Liu. 2024. “Study on calculation method of jacking force for circular curve pipe jacking considering pipe-soil contact state.” Indian Geotech. J. 54 (4): 1392–1405. https://doi.org/10.1007/s40098-023-00814-4.
Peixin, S., Y. Caicheng, P. Jianli, and L. Wei. 2017. “Analysis on the jacking load of the curved pipe roof supporting the large diameter Gongbei tunnel.” Chin. J. Rock Mech. Eng. 36 (9): 2251–2259. https://doi.org/10.13722/j.cnki.jrme.2017.0127.
Pellet-Beaucour, A.-L., and R. Kastner. 2002. “Experimental and analytical study of friction forces during microtunneling operations.” Tunnelling Underground Space Technol. 17 (1): 83–97. https://doi.org/10.1016/S0886-7798(01)00044-X.
Peng, Z., T. Li-Xin, and M. Bao-Song. 2017. “Formulae for frictional resistance considering mud thixotropy and pipe-soilcontact characteristics.” Chin. J. Geotech. Eng. 39 (11): 2043–2049.
Ramezanpour, M., and S. M. Mir Mohammad Hosseini. 2022. “Numerical simulation for the estimation of the critical length of steel pipe jacking in alluvial ground.” J. Pipeline Syst. Eng. Pract. 13 (4): 04022033. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000669.
Reilly, C. C. 2014. The influence of lubricant slurries on skin friction resistance in pipe jacking. Dublin, Ireland: Trinity College Dublin.
Reilly, C. C., and T. L. Orr. 2017. “Physical modelling of the effect of lubricants in pipe jacking.” Tunnelling Underground Space Technol. 63 (Apr): 44–53. https://doi.org/10.1016/j.tust.2016.11.005.
Sheil, B. B., S. K. Suryasentana, J. O. Templeman, B. M. Phillips, W.-C. Cheng, and L. Zhang. 2022. “Prediction of pipe-jacking forces using a Bayesian updating approach.” J. Geotech. Geoenviron. Eng. 148 (1): 04021173. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002645.
Shen, S.-L., Q.-L. Cui, C.-E. Ho, and Y.-S. Xu. 2016. “Ground response to multiple parallel microtunneling operations in cemented silty clay and sand.” J. Geotech. Geoenviron. Eng. 142 (5): 04016001. https://doi.org/10.1061/(ASCE)GT.1943-5606.0001441.
Shi, P., W. Liu, J. Pan, and C. Yu. 2018. “Experimental and analytical study of jacking load during microtunneling Gongbei tunnel pipe roof.” J. Geotech. Geoenviron. Eng. 144 (1): 05017006. https://doi.org/10.1061/(ASCE)GT.1943-5606.0001801.
Shimada, H., T. Sasaoka, S. Khazaei, Y. Yoshida, and K. Matsui. 2006. “Performance of mortar and chemical grout injection into surrounding soil when slurry pipe-jacking method is used.” Geotech. Geol. Eng. 24 (1): 57–77. https://doi.org/10.1007/s10706-004-1940-6.
Shou, K., and F. Chang. 2006. “Analysis of pipe-soil interaction for a miniature pipe jacking.” J. Mech. 22 (3): 213–220. https://doi.org/10.1017/S172771910000085X.
Shou, K., J. Yen, and M. Liu. 2010. “On the frictional property of lubricants and its impact on jacking force and soil–pipe interaction of pipe-jacking.” Tunnelling Underground Space Technol. 25 (4): 469–477. https://doi.org/10.1016/j.tust.2010.02.009.
Shou, K.-J., and J.-H. Yen. 2010. “On the behavior of a stuck curved pipe-jacking.” In Proc., ICPTT 2011: Sustainable Solutions for Water, Sewer, Gas, and Oil Pipelines, 2357–2365. Reston, VA: ASCE.
Sun, Y., D. Song, Y. Li, and S. Guojian. 2022. “Calculation of jacking force of rectangular pipe jacking considering thixotropy of mud.” Chin. J. Underground Space Eng. 18 (4): 1097–1103.
Tang, J., S. Li, and Y. Zhu. 2021. “Measurement and analysis of settlement induced by rectangular pipe jacking in silt stratum.” Adv. Mater. Sci. Eng. 2021 (1): 8347227. https://doi.org/10.1155/2021/8347227.
Tang, Z. 2019. “Analysis on measures for safety risk management of shield construction in subway tunnels.” Build. Tech. Dev. 46 (8): 82–83.
Tao, L.-J., Y. Zhang, X. Zhao, J. Bian, X.-H. Chen, S. An, and X.-C. Han. 2021. “Group effect of pipe jacking in silty sand.” J. Geotech. Geoenviron. Eng. 147 (11): 05021012. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002613.
Tong, L., H. Zhou, H. Shen, and H. Liu. 2022. “A complex variable solution for shallow rectangular tunnel in semi-infinite plane.” J. Eng. Mech. 148 (4): 04022012. https://doi.org/10.1061/(ASCE)EM.1943-7889.0002093.
Wang, C. 1999. “For pipe jacking construction pipe surface frictional resistance formula under discussion.” Spec. Struct. 16 (3): 22–25.
Wang, C., and W. Long. 2014. “Experimental study on the slurry formulation used for the large diameter long distance pipe-jacking project.” J. Railway Sci. Eng. 11 (1): 106–111. https://doi.org/10.19713/j.cnki.43-1423/u.2014.01.017.
Wang, H., Z. Xiiao, D. Tang, H. Jinjiang, and Z. Weizhong. 2019a. “Numerical simulation and field monitoring of construction process of rectangular pipe jacking in No. 1 underground passage of Shangdu road station on Zhengzhou metro line 4.” Supplement, Tunnel Constr. 39 (S2): 110–119.
Wang, J., D. Zhang, J. Chen, Q. Fang, Z. Sun, and S. Lu. 2024a. “A novel mechanics model for predicting vertical load and jacking force via rectangle pipe considering soil arching effect.” Tunnelling Underground Space Technol. 152 (Jun): 105952. https://doi.org/10.1016/j.tust.2024.105952.
Wang, L., J. He, and C. Fan. 2018. “Research and application of drag reduction by grouting the pipe jacking in complex conditions.” Mod. Tunnelling Technol. 55 (3): 200–204. http://10.13807/j.cnki.mtt.2018.03.027.
Wang, M., and D. Liu. 2016. “Test of thixotropic slurry properties and study of resistance reducing technology for pipe jacking tunnel construction.” Mod. Tunnelling Technol. 53 (6): 182–189. http://10.13807/j.cnki.mtt.2016.06.024.
Wang, N., Y. Gao, S. Yu, and Y. Ll. 2019b. “Disturbance of rectangular pipe jacking tunnel group construction on soil behind working shaft.” Tunnel Constr. 39 (3): 413–420.
Wang, S., C.-C. Xia, and J.-K. Ge. 2014. “Formulae of lateral friction resistance for pipe-jacking considering different forms of mud screen.” Chin. J. Geotech. Eng. 35 (1): 159–166. http://10.16285/j.rsm.2014.01.024.
Wang, W., R. Deng, and H. Liu. 2023. “Stability analysis of 3D tunnel face of shallow rectangular shield tunnel.” KSCE J. Civ. Eng. 27 (3): 1368–1382. https://doi.org/10.1007/s12205-023-1511-0.
Wang, X., X. Wei, G. Wei, C. Zhu, T. Jin, and Z. Yan. 2024b. “Theoretical and numerical analysis of the failure mechanism and jacking force during vertical tunneling using a CEL approach.” Tunnelling Underground Space Technol. 148 (Sep): 105765. https://doi.org/10.1016/j.tust.2024.105765.
Wang, X., F. Zhou, Z. Zhang, and J. Guo. 2016. “Dynamic deformation of the oversized cross-section rectangular pipe-jacking tunnel.” Sci. J. Earth Sci. 41 (11): 1959–1965.
Wang, Y., D. Zhang, Q. Fang, X. Liu, and J. Wang. 2022. “Analytical solution on ground deformation caused by parallel construction of rectangular pipe jacking.” Appl. Sci. 12 (7): 3298. https://doi.org/10.3390/app12073298.
Wei, G., R. Xu, J.-Y. Yu, and Z. Wang. 2005. “Site-based experimental study on pipe behavior during pipe jacking.” Rock Soil Mech. 26 (8): 1273–1277. http://10.16285/j.rsm.2005.08.019.
Wei, J., Z. Wenping, D. Wei, X. Xin, C. Baoguo, and W. Chengpeng. 2019. “Calculation method of surrounding earth pressure and jacking force of large cross-section rectangular pipe jacking.” J. Inner Mongolia Univ. Sci. Technol. 38 (4): 375–379. http://10.16559/j.cnki.2095-2295.2019.04.014.
Wei, X., X. Wang, G. Wei, and L. Lu. 2023. “Numerical simulation analysis of the jacking force and its influencing factors during the vertical tunneling process.” Math. Probl. Eng. 2023 (1): 3372244. https://doi.org/10.1155/2023/3372244.
Wei, X., S. Zhang, X. Wang, L. Lu, and Z. Ding. 2022. “Study of the indoor model test and CEL simulation of jacking force in the vertical tunnelling method.” Adv. Civ. Eng. 2022 (1): 3046621. https://doi.org/10.1155/2022/3046621.
Wen, K., H. Shimada, W. Zeng, T. Sasaoka, and D. Qian. 2020. “Frictional analysis of pipe-slurry-soil interaction and jacking force prediction of rectangular pipe jacking.” Eur. J. Environ. Civ. Eng. 24 (6): 814–832. https://doi.org/10.1080/19648189.2018.1425156.
Wu, B., Y. Peng, G. Meng, and P. Songquan. 2021. “Analysis on ground surface heaving ahead of cutting face caused by large section rectangular pipe jacking in soft soil layer.” Mod. Tunnelling Technol. 58 (2): 86–92. http://10.13807/j.cnki.mtt.2021.02.011.
Wu, D., H. Zhao, and H. Shen. 2022a. “Bending performance of the steel longitudinal joint for quasi-rectangular pipe-jacking tunnels.” J. Pipeline Syst. Eng. Pract. 13 (3): 04022026. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000666.
Wu, Y., W. Liu, P. Jia, and S. Peixin. 2022b. “Construction disturbance analysis of jacked box tunneling overcrossing existing tunnel at short distance.” Chin. J. Underground Space Eng. 18 (6): 1968–1978.
Xiao, Z., T. Cao, C. Xu, Y. Kai, D. Qiongying, J. Yinan, G. Xingyue, S. Zhipeng, W. Xianya, and Z. Ming. 2021a. “Superposition principle based numerical estimation method of jacking force of vertical curved jacking pipes with large rectangular section.” Mod. Tunnelling Technol. 58 (6): 68–76. http://10.13807/j.cnki.mtt.2021.06.008.
Xiao, Z., J. Lin, D.-S. Tang, and C.-Y. Xu. 2021b. “Estimations of the jacking forces of large-sized rectangular jacking pipes based on a displacement control method.” Adv. Civ. Eng. 2021 (1): 8790899. https://doi.org/10.1155/2021/8790899.
Xiao, Z.-Q., K.-Q. Luo, K. Yang, C.-Y. Xu, J. Lin, Y.-L. Shi, M. Zhong, X.-Y. Geng, Z.-P. Shu, and X.-Y. Wang. 2024. “Numerical analysis of distribution characteristics of jacking force in thin-walled pipe groups.” Soil Mech. Found. Eng. 61 (6): 99–106.
Xu, H., F. Ye, Q. Liu, T. Liming, and A. Huan. 2022. “Study on stratum deformation caused by large-section rectangular pipe jacking and jacking parameter control.” Mod. Tunnelling Technol. 59 (6): 97–105. http://10.13807/j.cnki.mtt.2022.06.011.
Xu, Y., Z. Zhang, M. Shi, W. Wanhua, and K. Jiawang. 2019. “Study on the effect of positive additional thrust on the surface uplift deformation by the construction of the rectangular pipe jacking with earth pressure balance.” J. Xian Univ. Archit. Technol. 51 (6): 814–824. http://10.15986/j.1006-7930.2019.06.007.
Yang, H., L. Rong, and X. Hucheng. 2016. “Application of drag reduction technology to extra-large cross sectional rectangular pipe jacking: Case study of tunnel crossing underneath Zhongzhou Road in Zhengzhou.” Tunnel Constr. 36 (4): 458–464.
Yang, K., Z. Xiao, and S. Liu. 2021. “Estimation of jacking force of small and medium sized thin-wall pipe jacking.” J. Wuhan Inst. Technol. 43 (1): 81–85. https://doi.org/10.19843/j.cnki.CN42-1779/TQ.201911017.
Yang, S., and M. Baogang. 2018. “Analysis on influence on rectangular pipe jacking construction on adjacent piles.” Supplement, Chin. J. Underground Space Eng. 14 (S2): 781–787.
Yang, S., M. Wang, J. Du, Y. Guo, Y. Geng, and T. Li. 2020a. “Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method.” Tunnelling Underground Space Technol. 97 (Apr): 103277. https://doi.org/10.1016/j.tust.2019.103277.
Yang, S.-S., M. Wang, D. Jian-an, Y. Guo, and G. Yan. 2020b. “Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement.” J. Zhejiang Univ. 54 (9): 1706–1714.
Yang, X., Y. Liu, and C. Yang. 2018. “Research on the slurry for long-distance large-diameter pipe jacking in expansive soil.” Adv. Civ. Eng. 2018 (1): 9040471. https://doi.org/10.1155/2018/9040471.
Yao, X. 2009. “Risk analysis and assessment during construction of shallow tunnel and underground engineering in urban area.” Dept. of Geotechnical Engineering, Beijing Jiaotong Univ.
Ye, Y., L. Peng, W. Yang, Y. Zou, and C. Cao. 2020. “Calculation of friction force for slurry pipe jacking considering soil-slurry-pipe interaction.” Adv. Civ. Eng. 2020 (1): 6594306. https://doi.org/10.1155/2020/6594306.
Ye, Y., L. Peng, Y. Zhou, W. Yang, C. Shi, and Y. Lin. 2019. “Prediction of friction resistance for slurry pipe jacking.” Appl. Sci. 10 (1): 207. https://doi.org/10.3390/app10010207.
Ye, Y.-C., L.-M. Peng, W.-C. Yang, M.-F. Lel, S. Cheng-Hua, and W. Zhe. 2015. “Calculation of jacking force for pipe-jacking considering mud slurry thixotropy.” Chin. J. Geotech. Eng. 37 (9): 1653–1659.
Yen, J., and K. Shou. 2015. “Numerical simulation for the estimation the jacking force of pipe jacking.” Tunnelling Underground Space Technol. 49 (Apr): 218–229. https://doi.org/10.1016/j.tust.2015.04.018.
Yu, B., H. Shimada, T. Sasaoka, A. Hamanaka, F. Matsumoto, and T. Morita. 2023. “A jacking force study based on interpretation of box jacking records: A case study of curved rectangular box jacking in soft soil in Saitama, Japan.” Tunnelling Underground Space Technol. 139 (Jun): 105228. https://doi.org/10.1016/j.tust.2023.105228.
Yu, J., and Y. Li. 2015. “Effect of physical properties of mud screen of pipe-jacking on jacking forces.” Supplement, China Civ. Eng. J. 48 (S2): 327–331.
Yuheng, Z., Z. Hao, Y. Ming, Z. Peng, and Z. Cong. 2023. “Jacking force calculation method of circular curved pipe jacking with consideration of pipe-soil contact characteristics.” Bull. Geol. Sci. Technol. 42 (3): 63–71. http://10.19509/j.cnki.dzkq.tb20210729.
Zeng, C., A. Xiao, K. Liu, H. Ai, Z. Chen, and P. Zhang. 2022. “Experimental study on the influence of slurry concentration and standing time on the friction characteristics of a steel pipe-soil interface.” Appl. Sci. 12 (7): 3576. https://doi.org/10.3390/app12073576.
Zhang, P., B.-S. Ma, C. Zeng, and L.-X. Tan. 2017a. “Numerical model for jacking force based on pipe-soil contact characteristics.” Chin. J. Geotech. Eng. 39 (2): 244–249.
Zhang, P., X. Wang, C. Zeng, and B. Ma. 2016. “Site monitoring of mechanical characteristics of pipes during steel curved pipe jacking under large buried depth.” Chin. J. Geotech. Eng. 38 (10): 1842–1848.
Zhang, X., Z. Wan, C. Wang, L. Yang, L. Shuo, W. Hanxun, and Z. Bin. 2021. “Optimization thixotropic slurry ratio and drag reduction performance test for rectangular pipe jacking in anhydrous sand layer.” J. Eng. Geol. 29 (5): 1611–1620. https://doi.org/10.13544/j.cnki.jeg.2021-0508.
Zhang, Y., X. Feng, H. Zhou, P. Zhang, B. Ma, L. Tan, and J. Wang. 2022. “Pressure characteristics of rectangular box jacking considering box-soil-lubricant interaction.” Tunnelling Underground Space Technol. 126 (Jul): 104569. https://doi.org/10.1016/j.tust.2022.104569.
Zhang, Y., Z.-G. Yan, and H. Zhu. 2017b. “Site-based researches on mechanical behavior of new large-diameter pipes during pipe jacking.” Chin. J. Geotech. Eng. 39 (10): 1842–1850.
Zhao, L., X. Longjiang, S. Yilei, and Y. Shuaihua. 2020. “Calculation and analysis of side wall reaction and deformation of small rectangular pipe well.” Supplement, Chin. J. Underground Space Eng. 16 (S2): 715–721.
Zhen, L., P. Yuqing, and L. Xiaojun. 2021. “Visualization test of synchronous grouting for large section rectangular pipe jacking.” Supplement, Mod. Tunnelling Technol. 58 (S1): 387–393. http://10.13807/j.cnki.mtt.2021.S1.049.
Zheng, B. 2021. “Analysis of shell earth pressure and jacking force of quasi-rectangular pipe jacking with large cross section: A Case study on underpass project at Songhu Road-Sanmen Road in Shanghai.” Tunnel Constr. 41 (10): 1740–1747.
Zhong, Z., C. Li, X. Liu, Y. Xiong, Y. Fan, and N. Liang. 2021. “Assessment of experimental friction parameters and contact property of pipe string for the estimation and verification of a solution for pipe stuck in the China’s first rock pipe jacking.” Tunnelling Underground Space Technol. 107 (Feb): 103671. https://doi.org/10.1016/j.tust.2020.103671.
Zhong, Z., Y. Xiong, S. Zhang, Y. Qinghui, and L. Chao. 2022. “Prototype test research on axial load-bearing characteristics of new jacking prestressed concrete cylinder pipe.” Chin. J. Underground Space Eng. 18 (5): 1623–1629.
Zhou, S., Y. Wang, and X. Huang. 2009. “Experimental study on the effect of injecting slurry inside a jacking pipe tunnel in silt stratum.” Tunnelling Underground Space Technol. 24 (4): 466–471. https://doi.org/10.1016/j.tust.2008.11.003.
Zhou, X., P. Shl, W. Llu, J. Guo, and Y. Yang. 2021. “Analysis on ground surface settlement during rectangular box jacking in saturated soft ground.” J. Beijing Jiaotong Univ. 45 (3): 69–76.
Zong, Q.-L., W.-P. Zhao, C. Wang, C. Bao-Guo, and X. Xin. 2019. “Influence of supporting force of large-section rectangular pipe jacket on surrounding soil & reasonable value range.” China Munic. Eng. 5: 13–16.
Information & Authors
Information
Published In
Copyright
© 2025 American Society of Civil Engineers.
History
Published online: Apr 4, 2025
Published in print: Aug 1, 2025
Discussion open until: Sep 4, 2025
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.