Skip to main content
Technical Papers
Feb 11, 2012

Automated Progress Monitoring Using Unordered Daily Construction Photographs and IFC-Based Building Information Models

Publication: Journal of Computing in Civil Engineering
Volume 29, Issue 1

Abstract

Accurate and efficient tracking, analysis and visualization of as-built (actual) status of buildings under construction are critical components of a successful project monitoring. Such information directly supports control decision-making and if automated, can significantly impact management of a project. This paper presents a new automated approach for recognition of physical progress based on two emerging sources of information: (1) unordered daily construction photo collections, which are currently collected at almost no cost on all construction sites; and (2) building information models (BIMs), which are increasingly turning into binding components of architecture/engineering/construction contracts. First, given a set of unordered and uncalibrated site photographs, an approach based on structure-from-motion, multiview stereo, and voxel coloring and labeling algorithms is presented that calibrates cameras, photorealistically reconstructs a dense as-built point cloud model in four dimensions (three dimensions + time), and traverses and labels the scene for occupancy. This strategy explicitly accounts for occlusions and allows input images to be taken far apart and widely distributed around the environment. An Industry Foundation Class–based (IFC-based) BIM is subsequently fused into the as-built scene by a robust registration step and is traversed and labeled for expected progress visibility. Next, a machine-learning scheme built upon a Bayesian probabilistic model is proposed that automatically detects physical progress in the presence of occlusions and demonstrates that physical progress monitoring at schedule activity level could be fully automated. Finally, the system enables the expected and reconstructed elements to be explored with an interactive, image-based, three-dimensional (3D) viewer where deviations are automatically color-coded over the IFC-based BIM. To that extent, the underlying hypotheses and algorithms for generating integrated four-dimensional (4D) as-built and as-planned models plus automated progress monitoring are presented. Experimental results are reported for challenging image data sets collected under different lighting conditions and severe occlusions from two ongoing building construction projects. This marks the presented model as being the first probabilistic model for automated progress tracking and visualization of deviations that incorporates both as-planned models and unordered daily photographs in a principled way.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

Authors like to thank Turner Construction and University of Illinois–Housing and Facilities and Services for their contributions to this research project. Special thanks to Mr. Greg Cuttell, Turner Construction’s project manager and Mr. Robert Bursack and Mr. Nick Canellis, Turner Construction’s project executives. This work was funded by the National Science Foundation grant CMMI-0800500. Any opinions, findings, and conclusions or recommendations expressed in this paper are those of the authors and do not reflect the views of the National Science Foundation or the companies and individuals mentioned above. 

References

Abeid, J. N., and Arditi, D. (2002). “Time-lapse digital photography applied to project management.” J. Constr. Eng. Manage., 530–535.
Abeid, J., Allouche, E., Arditi, D., and Hayman, M. (2003). “PHOTO-NET II: a computer-based monitoring system applied to project management.” J. Autom. Constr., 12(5), 603–616.
Abudayyeh, O. Y. (1997). “Audio/visual information in construction project control.” Adv. Eng. Software, 28(2), 97–101.
Agarwal, S., Snavely, N., Simon, I., Seitz, S. M., and Szeliski, R. (2009). “Building Rome in a day.” Proc., Int. Conf. on Computer Vision, IEEE, Kyoto, Japan.
Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., and Park, K. (2006). “A formalism for utilization of sensor systems and integrated project models for active construction quality control.” J. Autom. Constr., 15(2), 124–138.
Alves, N., and Bartolo, P. (2006). “Integrated computational tools for virtual and physical automatic construction.” J. Autom. Constr., 15(3), 257–271.
Arman, F., and Aggarwal, J. K. (1993). “Model-based object recognition in dense-range images: A review.” Comput. Surv., 25(1), 5–43.
Besl, P., and McKay, N. (1992). “A method for registration of 3-d shapes.” IEEE Trans. Pattern Anal. Mach. Intell., 14(2), 239–256.
Bosché, F. (2010). “Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction.” Adv. Eng. Inf., 24(1), 107–118.
Bosché, F., Haas, C. T., and Akinci, B. (2009). “Automated recognition of 3D CAD objects in site laser scans for project 3d status visualization and performance control.” J. Comput. Civ. Eng., 311–318.
Chang, C.-C., and Lin, C.-J. (2001). “LIBSVM: A library for support vector machines.” 〈http://www.csie.ntu.edu.tw/cjlin/libsvm〉 (May 1, 2010).
Cordova, F., Sideris, D., Brilakis, I., and Angelides, D. (2009). “Validation of vision tracking at Egnatia Odos Motorway.” Proc., ASCE Construction Research Congress, ASCE, Reston, VA.
Cornelis, N., Leibe, B., Cornelis, K., and Gool, L. V. (2008). “3D urban scene modeling integrating recognition and reconstruction.” Int. J. Comput. Vision, 78(2–3), 121–141.
Dai, F., and Lu, M. (2008). “Photo-based 3D modeling of construction resources for visualization of operations Simulation: Case of modeling a precast façade.” Proc., 2008 Winter Simulation Conf., Informs Simulation Society, Washington, DC, 2439–2446.
Debevec, P. E., Taylor, C. J., and Malik, J. (1996). “Modeling and rendering architecture from photographs: A hybrid geometry and image-based approach.” Proc., 23rd Annual Conf. on Computer Graphics and Interactive Techniques, ACM, New York, 11–20.
Du, S., Zheng, N., Ying, S., You, Q., and Wu, Y. (2007). “An extension of the ICP algorithm considering scale factor.” Vol. 5, IEEE Int. Conf. on Image Processing, IEEE, San Antonio, TX, 193–196.
Echeverry, D., and Beltran, A. (1997). “Bar-code control of construction field personnel and construction materials.” Proc., 4th Congress in Computing in Civil Engineering, Philadelphia, PA, ASCE, Reston, VA, 341–347.
Echeverry, D., Ibbs, C. W., and Kim, S. (1991). “Sequence knowledge for construction scheduling.” J. Constr. Eng. Manage., 118–130.
El-Omari, S., and Moselhi, O. (2008). “Integrating 3D laser scanning and photogrammetry for progress measurement of construction work.” J. Autom. Constr., 18(1), 1–9.
Ergen, E., Akinci, B., East, B., and Kirby, J. (2007). “Tracking components and maintenance history within a facility utilizing radio frequency identification technology.” J. Comput. Civ. Eng., 11–20.
Everett, J., Halkali, H., and Schlaff, T. (1998). “Time-lapse video applications for construction project management.” J. Constr. Eng. Manage., 204–209.
Fan, R. E., Chang, K. W., Hsieh, C. J., Wang, X. R., and Lin, C. J. (2008). “LIBLINEAR: A library for large linear classification.” J. Mach. Learn. Res., 9, 1871–1874.
Freund, Y., and Schapire, R. E. (1999). “A short introduction to boosting.” J. Jpn. Soc. Artif. Intell., 14(5), 771–780.
Furukawa, Y., and Ponce, J. (2006). “High-fidelity image based modeling.” Technical Rep. 2006-02, Univ. of Illinois, Urbana,IL.
Furukawa, Y., and Ponce, J. (2010). “Accurate, dense, and robust multi-view stereopsis.” IEEE Trans. Pattern Anal. Mach. Intell., 32(8), 1362–1376.
Furukawa, Y., Curless, B., Seitz, S. M., and Szeliski, R. (2009). “Reconstructing building interiors from images.” Proc., Int. Conf. on Computer Vision, IEEE, Kyoto, Japan.
Gilligan, B., and Kunz, J. (2007). “VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity.” CIFE Technical Rep. #TR171, Stanford University, Stanford, CA.
Golparvar-Fard, M., Peña-Mora, F., and Savarese, S. (2011). “Integrated sequential as-built and as-planned representation with D4AR tools in support of decision-making tasks in the AEC/FM industry.” J. Constr. Eng. Manage., 137(12), 1099–1116.
Golparvar-Fard, M., Peña-Mora, F., and Savarese, S. (2009a). “D4AR- A 4-dimensional augmented reality model for automating construction progress data collection, processing and communication.” J. Inf. Technol. Constr., 14, 129–153.
Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., and Lee, S. H. (2009b). “Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs.” J. Comput. Civ. Eng., 391–404.
Golparvar-Fard, M., and Peña-Mora, F. (2007). “Development of visualization techniques for construction progress monitoring.” Proc., ASCE Int. Workshop on Computing in Civil Eng, ASCE, Reston,VA.
Gordon, C., Boukamp, F., Huber, D., Latimer, E., Park, K., and Akinci, B. (2003). “Combining reality capture technologies for construction defect detection: A case study.” Proc., 9th EuropIA Int. Conf. (EIA9), Istanbul, Turkey, 99–108.
Hartley, R., and Zisserman, A. (2004). Multiple view geometry, Cambridge University Press, Cambridge, U.K.
Horn, B. (1987). “Closed-form solution of absolute orientation using unit quaternions.” J. Optic. Soc. A, 4(4), 629–642.
Huber, D., and Hebert, M. (2003). “3D modeling using a statistical sensormodel and stochastic search.” Proc., Computer Vision and Pattern Recognition. 2003 IEEE Computer Society Conference on, Vol. 1, IEEE, Madison, WI, 858–865.
Huertas, A., and Nevatia, R. (2000). “Detecting changes in aerial views of man-made structures.” Image Vision Comput., 18(8), 583–596.
Ibrahim, Y. M., and Kaka, A. P. (2008). “Review of photographic/imaging applications in construction.” J. Built Human Environ. Rev., 1(2008), 99–117.
Ibrahim, Y. M., Lukins, T. C., Zhang, X., Trucco, E., and Kaka, A. P. (2009). “Towards automated progress assessment of workpackage components in construction projects using computer vision.” Adv. Eng. Inf., 23(1), 93–103.
Jaselskis, E., and El-Misalami, T. (2003). “Implementing radio frequency identification in the construction process.” J. Constr. Eng. Manage., 680–688.
Jung, Y., Chin, S., and Cho, C. (2004). “Automated progress measurement framework using standard work packages.” Proc., 4th Int. Conf. on Construction Project Management, ICCPM, Marina, Singapore, 472–436.
Kim, H., and Kano, N. (2008). “Comparison of construction photograph and VR image in construction progress.” J. Autom. Constr., 17(2), 137–143.
Kiziltas, S., Akinci, B., Ergen, E., and Tang, P. (2008). “Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management.” J. Inf. Technol. Constr., 13, 134–154.
Koo, B., and Fischer, M. (2000). “Feasibility study of 4D in commercial construction.” J. Constr. Eng. Manage., 251–260.
Koo, B., Fischer, M., and Kunz, J. (2007). “Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives.” J. Comput. Civ. Eng., 423–433.
Leung, S., Mak, S., and Lee, B. (2008). “Using a real-time integrated communication system to monitor the progress and quality of construction works.” J. Autom. Constr., 17(6), 749–757.
Levoy, M., et al. (2000). “The digital Michelangelo project: 3D scanning of large statues.” Proc., ACM SIGGRAPH 2000, ACM, New York, 131–144.
Lowe, D. (2004). “Distinctive image features from scale-invariant keypoints.” Int. J. Comput. Vision, 60(2), 91–110.
Lukins, T., and Trucco, E. (2007). “Towards automated visual assessment of progress in construction Projects.” Proc., British Machine Vision Conf., The British Machine Vision Association and Society for Pattern Recognition, Warwick, U.K.
McGraw-Hill Construction. (2009). “The business value of BIM: Getting BIM to the bottom line.”〈http://www.bim.construction.com/research/pdfs/2009_BIM_SmartMarket_Report.pdf〉 (Oct. 7, 2009).
Meredith, J., and Mantel, S. (2003). Project management: A managerial approach, 5th Ed., Wiley, New York.
Moore, J. F. A. (1992). Monitoring building structures, Nostrand Reinhold, New York.
Navon, R. (2007). “Research in automated measurement of project performance indicators.” J. Autom. Constr., 16(2), 176–188.
Navon, R., and Sacks, R. (2007). “Assessing research in automated project performance control (APPC).” J. Autom. Constr., 16(4), 474–484.
Nistér, D. (2004). “An efficient solution to the five-point relative pose problem.” IEEE Trans. Pattern Anal. Mach. Intell., 26(6), 756–770.
Nuntasunti, S., and Bernold, L. (2002). “Beyond WEBCAM: A site-Web-Site for building construction.” Proc., Int. Symp. on Automation and Robotics in Constr., IAARC, Bratislava, Slovakia.
Ordonez, C., Arias, P., Herraez, J., Rodriguez, J., and Martin, M. (2008). “Two photogrammetric methods for measuring flat elements in buildings under construction.” J. Autom. Constr., 17(5), 517–525.
Park, H. S., Lee, H. M., Adeli, H., and Lee, I. (2007). “A new approach for health monitoring of structures: terrestrial laser scanning.” Comput. Aided Civ. Infrastruct. Eng., 22(1), 19–30.
Peterson, F., and Fischer, M. (2009). “Project monitoring methods exploratory case analysis: industry responses.” ASCE Int. Workshop on Computing in Civ. Eng., ASCE, Reston, VA.
Podbreznik, P., and Rebolj, D. (2007). “Real-time activity tracking system–The development process.” 24th W78 Conf.: Bringing ITC Knowledge to Work, Maribor, Slovenia.
Poku, S., and Arditi, D. (2006). “Construction scheduling and progress control using geographical information systems.” J. Comput. Civ. Eng., 351–360.
Pollefeys, M., et al. (2008). “Detailed real-time urban 3D reconstruction from video.” Int. J. Comput. Vision, 78(2–3), 143–167.
Quiñones-Rozo, C., Hashash, Y., and Liu, L. (2008). “Digital image reasoning for tracking excavation activities.” J. Autom. Constr., 17(5), 608–622.
Reinhardt, J., Garrett, J., and Scherer, J. (2000). “The preliminary design of a wearable computer for supporting construction progress monitoring.” Internationales, Kolloquium über die Anwendung der Informatik und der Mathematik in Architektur und Bauwesen, Univ. of Weimar, Weimar, Germany.
Schindler, G., Krishnamurthy, P., Lublinerman, R., Liu, Y., and Dellaert, F. (2008). “Detecting and matching repeated patterns for automatic geo-tagging in urban environments.” Proc., Computer Vision and Pattern Recognition, IEEE, Anchorage, AK.
Seitz, S. M., and Dyer, C. R. (1999). “Photorealistic scene reconstruction by voxel coloring.” Int. J. Comput. Vision, 35(2), 151–173.
Shih, N., and Wang, P. (2004). “Point cloud-based comparison between construction schedule and as-built progress: Long-range three-dimensional laser scanner’s approach.” J. Archit. Eng., 98–102.
Shih, N., Lai, J., and Tsai, Y. L. (2006). “The application of a panorama image database management system (pidms) for information integration on construction sites.” ITcon, 11, 641–654.
Sinha, S., Steedly, D., Szeliski, R., Agrawala, M., and Pollefeys, M. (2008). “Interactive 3D architectural modeling from unordered photo collections.” Proc., SIGGRAPH Asia 2008, ACM, New York, 1–10.
Snavely, N., Seitz, S. M., and Szeliski, R. (2006). “Photo tourism: Exploring photo collections in 3D.” ACM Trans. Graph. (SIGGRAPH Proc.), 25(3), 835–846.
Snavely, N., Seitz, S. M., and Szeliski, R. (2008). “Modeling the world from internet photo collections.” Int. J. Comput. Vision, 80(2), 189–210.
Soibelman, L., Wu, J., Caldas, C., Brilakis, I., and Lin, K. Y. (2008). “Management and analysis of unstructured construction data types.” J. Adv. Eng. Inf., 22(1), 15–27.
Song, L. (2007). “Progress measurement using CAD-based vision system.” Proc., 2007 Construction Research Congress, ASCE, Reston, VA.
Su, Y., Hashash, Y., and Liu, L. Y. (2006). “Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation.” J. Constr. Eng. Manage., 1234–1241.
Teizer, J., Kim, C., Haas, C., Liapi, K., and Caldas, C. (2005). “Framework for real-time three-dimensional modelling of infrastructure.” Geology and properties of earth materials 2005, Transportation Research Board National Research Council, Washington, DC, 177–186.
Triggs, B., McLauchlan, P., Hartley, R., and Fitzgibbon, A. (1999). “Bundle adjustment – A modern synthesis.” Int. Workshop on Vision Algorithms, Springer, Berlin, Heidelberg, 153–177.
Trupp, T., Marulanda, C., Hashash, Y., Liu, L., and Ghaboussi, J. (2004). “Novel technologies for tracking construction progress of deep excavations.” Proc., Geotechnical Engineering for Transportation Projects, ASCE, Reston, VA, 2254–2262.
Uffenkamp, V. (1993). “State of the art of high precision industrial photogrammetry.” Proc., 3rd Int. Workshop on Accelerator Alignment, Springer, Berlin, Heidelberg.
Wu, Y., and Kim, H. (2004). “Digital imaging in assessment of construction project progress.” Proc., 21st Int. Symp. on Automation and Robotics in Construction, IAARC, Bratislava, Slovakia.
Yoders, J. (2009). “Wisconsin becomes the first state to require BIM on large, public projects.” 〈http://www.bdcnetwork.com/wisconsin-becomes-first-state-require-bim-public-projects〉 (Jul. 20, 2009).
Zhang, X., et al. (2009). “Automating progress measurement of construction projects.” J. Autom. Constr., 18(3), 294–301.
Zebedin, L., Bauer, J., Karner, K., and Bischof, H. (2008). “Fusion of feature- and area-based information for urban buildings modeling from aerial imagery.” Comput. Vision–ECCV, 5305, 873–886.

Information & Authors

Information

Published In

Go to Journal of Computing in Civil Engineering
Journal of Computing in Civil Engineering
Volume 29Issue 1January 2015

History

Received: Dec 21, 2011
Accepted: Feb 9, 2012
Published online: Feb 11, 2012
Discussion open until: Aug 25, 2014
Published in print: Jan 1, 2015

Permissions

Request permissions for this article.

Authors

Affiliations

Mani Golparvar-Fard, A.M.ASCE [email protected]
Assistant Professor, Charles E. Via Dept. of Civil and Environmental Engineering, Virginia Tech, 200 Patton Hall, Blacksburg, VA 24061 (corresponding author). E-mail: [email protected]
Feniosky Peña-Mora, M.ASCE [email protected]
Dean, Fu Foundation School of Engineering and Applied Science and Morris A. and Alma Schapiro Professor of Civil Engineering and Engineering Mechanics, Earth and Environmental Engineering, and Computer Science, Columbia Univ., 510 S.W. Mudd Building, 500 W. 120th St., New York, NY 10027. E-mail: [email protected]
Silvio Savarese [email protected]
Assistant Professor, Electrical and Computer Engineering, Univ. of Michigan, 1301 Beal Ave., Room 4120, Ann Arbor, MI 48109-2122. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Figures

Tables

Media

Share

Share

Copy the content Link

Share with email

Email a colleague

Share