The benefits of conducting risk analyses in the planning of construction projects are widely acknowledged. However, the actual implementation of procedures notably differs significantly across industry segments. Even within an organization, different units represent risks differently, depending on their primary function. As a result, a holistic picture of the risk exposure is often hard to describe and even harder to manage. The objective of this paper is to provide a link between strategic planning theory, namely the resource-based view (RBV), and project risk management. The proposed resource-based approach is based on the development of a project causal network which then allows for both data-intensive and conceptual evaluation of the project risks, primarily focusing on cost impacts. The key contribution of this paper is the capacity of the developed framework to integrate with a number of methods already used in project management practices with little to no additional data requirement. These contributions are illustrated using real project data.
The Resource-Based View on Project Risk Management
Downloaded 2,162 times
Technical Papers
The Resource-Based View on Project Risk Management
Abstract
Authors
Risk Management Specialist, Dept. of Risk and Reliability, Genesis Consultants, 11740 Katy Freeway Suite 1100, Houston, TX 77079. E-mail: [email protected]
Associated Professor, Zachry Dept. of Civil Engineering, Texas A&M Univ., TAMU3136, College Station, TX 77843 (corresponding author). E-mail: [email protected]
Received: February 26, 2015
Accepted: December 04, 2015
Published online: March 02, 2016